Property legal description: lot number, block number and subdivision name
OR metes and bounds description.
Contractor's name and state license number if a contractor is performing
your work.
Two copies of plans are needed for most construction projects before a
building permit can be issued. Most plans can be hand-drawn if they are to
scale and the proposed work is clearly indicated. An Arizona architect's or
engineer's seal on the plans may be required if the proposed structural
condition is unusual.
Whether construction is being done in the public right of way.
Valuation of proposed work, i.e., the market value of improvement (the
value should include material, labor, overhead and profit).
The following links show illustrations and information on typical plans that are required.