|
Water and Wastewater Development Occupational Fees
Development Occupational Fees (DOF) were adopted by the city Council on
November 1, 1984 (Ordinance G-2664/G-2665/G-2666/G-2667). These fees were
created to defray the cost of providing public improvements required by the city as a result of new development. They are broken down into two types:
Residential and Commercial/Industrial fees.
A. Calculating DOF Fees
Water and Sewer DOF fees are the same. The figure you obtain for the Water
DOF fee is used to calculate your Sewer DOF fee. You simply add the two fees
together to obtain your total DOF fee, (i.e. Single-Family residential project:
Water DOF $600 + Sewer DOF $600 = Total DOF $1200; Commercial project: 1" water
meter within City = Water DOF $1,500 + Sewer DOF $1,500 = Total DOF $ 3000;
B. Residential Fees (Use chart below):
| Type of Residence |
Inside City Fee |
Outside City Fee* |
| Single Family |
$600.00 |
$900.00 |
| Mobile Home Space |
420.00 |
630.00 |
| Apartment or Dwelling Unit In a Multiple Family Development |
360.00 |
540.00 |
C. Commercial and Industrial Development Occupational Fee will be
based upon meter size.
Water Development Occupational Fees are based on three (3) factors: water
meter size and water type (disk, compound, turbo) and if the side is inside
or outside the boundaries. Sewer Development Occupation Fees are the same
as water DOF fees.
| Water Meter |
Meter Type |
Inside |
Outside |
| Size |
|
City Fees |
City Fees |
| 5/8" |
Disk |
$ 600 |
$ 900 |
| 3/4 |
Disk |
600 |
900 |
| 1" |
Disk |
1,500 |
2,250 |
| 1 1/2" |
Disk |
2,760 |
4,140 |
| 2" |
Disk |
4,500 |
6,750 |
| 2" |
Turbine |
7,200 |
10,800 |
| |
| 3" |
Disk |
9,000 |
13,500 |
| 3" |
Compound |
9,240 |
13,860 |
| 3" |
Turbine |
16,200 |
24,300 |
| 4" |
Compound |
15,000 |
22,500 |
| 4" |
Turbine |
18,000 |
27,000 |
| |
| 6" |
Compound |
27,600 |
41,400 |
| 6" |
Turbine |
37,500 |
56,250 |
| |
| 8" |
Compound |
48,000 |
72,000 |
| 8" |
Turbine |
54,000 |
81,000 |
Last modified on
07/02/2007 14:33:29 |