Printer-friendly page
Click to print


IFB 08-102 (JH) Scope
REPLACE CARPET TILE AT BURTON BARR CENTRAL LIBRARY – SECOND FLOOR

Provide all labor, material, equipment, transportation and services necessary to replace floor covering including demolition of existing floor covering and rubber cover base, floor preparation, then furnish and install new carpet and cove base on the second floor of the Burton Barr Central Library, as specified to meet requirements of the specifications in IFB 08-102.

pdf icon Download the bid (PDF, requires the free Adobe Reader.)

Last modified on 

© Copyright 2007, City of Phoenix