|
Development Impact Fees
The table below details the different components
involved in calculating all the fees collected by the city for a
standard single-family home (or an EDU). (Assumes a 5/8-inch by
3/4-inch or a 3/4-inch by 3/4-inch water meter).
| Impact Fee Category |
Gross Impact Fee |
Offsets |
Net Impact Fee |
| Equipment
Repair |
87 |
13 |
74 |
| Fire Protection |
439 |
117 |
322 |
| Libraries |
479 |
54 |
425 |
| Roadway Facilities1 |
3,981 |
564 |
854 |
| Roadway Facilities 2% Additional Funding1 |
0 |
0 |
17 |
| Open Space2 |
1,162 |
34 |
1,108 |
| Parks2 |
6,428 |
1,632 |
4,072 |
| Police |
391 |
47 |
344 |
| Solid Waste |
407 |
449 |
0 |
| Storm Drainage |
0 |
0 |
0 |
| Wastewater |
2,265 |
1,198 |
1,067 |
| Water |
5,921 |
811 |
5,110 |
| Total |
21,560 |
- |
13,393 |
| Administration
Fee (1% of Gross Impact Fee) |
216 |
| Total
Fees (incl. impact Fees)3 |
$ 13,609 |
| 1 |
The Roadway Facilities fee is phased according to the following schedule - |
| |
|
Phase I: 25% of the full fee, May 18, 2009 through Sep. 3, 2010
Phase II: 50% of the full fee, Sep. 6, 2010 through Mar. 4, 2011
Phase III: 75% of the full fee, Mar. 7, 2011 through Sep. 2, 2011
Phase IV: 100% of the full fee, Sep. 5, 2011 |
| 2 |
The City Council is maintaining the existing net Parks and Open Space fees from the 2006 fee schedule. |
| 3 |
Add to this figure the Water
Resources Acquisition and Development
Occupational fees. |
Last modified on
05/28/2009 13:28:14
|