PLANNING
* Planning Hearing Officer Process
  - Application Submittal Checklist
  - Current Cases

Planning Hearing Officer Process

Application Submittal Checklist

A PHO application must be made in person (before 4:00pm) at the Zoning Services Counter, 6th Floor, 200 West Washington Street, Phoenix.

The following materials must be submitted with the application (Incomplete applications may result in postponements):

1)

Written Request

Include:

  • Project background
  • Specific stipulations to be modified
  • Reason for changing/deleting stipulation(s)
  • Suggested wording for new/revised stipulation(s)
  • If there was previous opposition to the original rezoning case

A written request for a time extension should clearly state:

  • the reason development has not occurred within the approved time; and
  • the length of extension requested.

2)

Information Form PDF

The Zoning Services Counter will assist if necessary

3)

Proposed Site Plan - 4 copies

2 scaled drawings, min. size C (17" x 22")

2 reductions (8.5" x 11")

4)

Proposed Elevations (if applicable)

Provide elevations for proposed building, signage, or wall, etc., as necessary to demonstrate how the stipulation would be modified

2 scaled drawings, min. size C (17" x 22")

2 reductions (8.5" x 11")

5)

Transparency

1 reduced (8.5" x 11") transparency of proposed site plan and elevations

6)

Parcel Map

Identify project area

7)

Affidavit of Notification PDF

As required per PHO process handout

8)

Ownership Verification PDF

Please ensure this form is filled out and signed

9)

Legal Description & Tax Parcel Number

Available from Property Records, 4th Floor, 200 West Washington Street, Phoenix



Last modified on 12/26/2008 14:56:38


  Related Links
* General Plan Amendment Process
* Rezoning and Special Permit Procedures Outline
* Rezoning Staff Reports
* Village Planning Committees
* Zoning Districts
* Zoning FAQs
* Zoning Fee Schedule
* Zoning Forms
* Zoning Interpretations
* Zoning Maps
* Zoning Ordinance
* Zoning Use Permits
* Zoning Variances
* Zoning Verification Letter