Salt River Project Service Ditch

The City of Phoenix in partnership with Salt River Project (SRP) will replace the existing SRP service ditch, located on the west side of 99th Ave. between Meadowbrook Ave. and Indian School Rd., with an underground pipe system.

Phase I of the project will include relocation of several utilities adjacent to the SRP service ditch, and installation of new underground pipe, which will be located west of the existing SRP Service ditch, from Meadowbrook Ave. to the north side of Campbell Avenue, and from the south side of Campbell Ave. to the north side of Indian School Rd.  A small section of ditch will remain open at the existing well located on the southwest corner of Campbell Ave. and 99th Ave.  Relocation of the utilities is underway, SRP will begin installation of the new underground pipe in late February 2010, followed by miscellaneous clean up and restoration of the area.  Construction of this phase is anticipated to be completed by the end of June 2010.  Phase II of the project will include removal of SRP's existing concrete service ditch and connection of the newly installed underground pipe into the existing system and is expected to begin in 2011 during SRP's annual system dry up.  For further information, please call the project hotline at (480) 281-1506.

Fractured Aggregate Surface Treatment (FAST) Project

The city of Phoenix Street Transportation Department has begun a pilot program, in the area of Bethany Home Road and Missouri Avenue between 35th Avenue and 39th Avenue, to test the useful product life of Fractured Aggregate Surface Treatment (FAST), a form of chip seal resurfacing. FAST provides a single application of rubberized asphalt and pre-coated chips to existing residential streets.  Applying FAST takes about one day and excess aggregate will be swept away and removed from the street, sidewalk, curbs and gutters before the street is open to vehicles.  Residents in the area will be notified at least 48 hours before work will take place in the area.  If you have any questions or feedback, please call the 24-hour project hotline at 1-877-349-1433 or send your questions via e-mail to ddavis@rhpartnering.com. 

Sewer Replacement Project

The city of Phoenix Street Transportation Department has awarded a contract to J. Wise Corporation to install new water main services and fire hydrants in the area bounded by 15th Ave. and 17th Ave. between Bethany Home Rd. and Maryland Ave. The project began in mid-July and is anticipated to be completed by May 2010.  Additionally, new water mains, services and hydrants will be installed in the area bounded by 19th Avenue, 17th Avenue between Bethany Home Road and Rose Lane.  The project will begin in late October and is anticipated to be completed by May 2010.  There will be some traffic lane restrictions during the improvement activity. For more information, please contact the construction hotline, at 602-956-2670.

Sidewalk Installation Program Project

The city of Phoenix Street Transportation Department has awarded a contract to Standard Construction to install sidewalks in the following areas: 
50th Dr. between Pierson St. and Glenrosa Ave. including the Minnezona Ave. and Roma Ave. cul-de-sacs;
48th Dr. between Pierson St. and Campbell Ave.;
Highland Ave. between 48th Dr. and 49th Ave.;
Hazelwood Street between 48th Dr. and 47th Ave.
Construction will begin the week of late November 2009 and the project is anticipated to be completed by Aug. 2010 weather permitting. For more information, please contact the construction hotline, at (602) 956-2670.

The city of Phoenix Street Transportation Department has awarded a contract to TALIS Construction to install sidewalks on Columbus Ave. and Clarendon Ave. between 65th Dr. and 63rd Ave.  Streetlights will also be installed.  Construction will begin the week of late November 2009 and the project is anticipated to be completed by summer 2010. For more information, please contact the construction hotline, at (602) 956-2670.

The city of Phoenix Street Transportation Department has awarded a contract to TALIS Construction to install sections of new sidewalk on the west side of 35th Ave. between Glendale Ave. and Lamar Rd.  In addition, new sidewalk ramps will be installed on the northwest and southwest corners of Lamar Rd. and 35th Ave. and on the northwest, southwest and southeast corners of Glendale Ave. and 35th Ave.    Construction will begin the week of March 29 and the project is anticipated to be completed by summer 2010. For more information, please contact the construction hotline, at (602) 956-2670.

Street Modernization Program (Paving, Curb, Gutter, Sidewalks, and Streetlight upgrades)

There are no projects at this time.

Storm Drain and Roadway Improvement Project:

There are no projects at this time.


Completed Projects in District 5

Bethany Home Grand Canal Flood Control Project: The project is approximately five miles in length and goes through agricultural, residential, and equestrian properties within the cities of Glendale and Phoenix, and Maricopa County is now completed in District 5. The Project Team has divided the project into segments based on neighborhood characteristics and major street crossings. For segment location map and project information, visit Web site fcd.maricopa.gov or call 602-506-8004

Maryland Avenue Pedestrian Overpass at Interstate 17 and Maryland Avenue.

The Street Transportation Department Sidewalk Installation program has completed the installation at the following location:


along 64th Dr. between Osborn Rd. and Indian School Rd, and the Weldon Ave., Fairmount Ave. and Amelia Ave. cul-de-sacs east of 64th Dr.

along 99th Avenue and107th Avenue between Camelback Rd. and  Indian School Rd.

Keim Dr., between 19th Ave.and 21st Ave.

along Mitchell Avenue between 63rd Avenue and 64th Drive and along 63rd Avenue between Osborn Rd. to the Grand Canal.

in the neighborhood bounded by 50th Dr., 49th Ave., Indian School Rd., and Pierson St.

on 47th Ave., between Indian School Rd. to Campbell Ave.

The Street Transportation Department Street Modernization program has completed the installation at the following location:

Orangewood Ave. and Northern Ave. between 31st Ave. to 35th Ave.

Campbell Ave. and Camelback Rd. between 87th Ave. and 91st Ave.

Camelback Rd. between 43rd Ave. and 35th Ave. was resurfaced with rubberized asphalt.

75th Ave. between Thomas Rd. and Indian School Rd. was resurfaced with rubberized asphalt.

Clarendon Ave. between 55th Ave. and Indian School Rd. was resurfaced with rubberized asphalt.

Glendale Ave. between Seventh Ave. and 19th Ave. was overlayed with rubberized asphalt.

Indian School Rd. between 59th Ave. and 67th Ave. was resurfaced with rubberized asphalt.

Maryvale Parkway between Indian School Rd. and Camelback Rd. was resurfaced with rubberized asphalt.

Maryvale Parkway between Clarendon Ave. and Indian School Rd. was resurfaced with rubberized asphalt.

73rd Ave. between Flower St. and Weldon Ave. was recently widened and curb, gutter, and sidewalk was installed.

The Street Transportation Department Storm Drain and Roadway Improvement Project:

The city of Phoenix Street Transportation Department has completed the installation of the new ADA pedestrian ramps and radius curb returns on the southeast and northeast corners of 107th Ave. and Camelback Rd.; repaving the north side of Camelback Rd. approximately 500-feet north of Camelback Rd. and the east side of 107th Ave. approximately 500-feet north of Camelback Rd.

The Water Department Sewer Replacement project has completed the installation at the following locations:

along 27th Ave. and 39th Ave. between Bethany Home Rd. and Maryland Ave.

along 71st Drive between Indian School Rd. and the Grand Canal.

along 71st Drive between Campbell Ave. and Indian School Rd.

along 19th Ave. between Hatcher Rd. and Ironwood Dr. and along Carol Ave. just east of 19th Ave.

along Butler Dr. between 15th Dr. and 16th Ave.