Water and Wastewater Development Occupational Fees

Development Occupational Fees (DOF) were adopted by the city Council on November 1, 1984 (Ordinance G-2664/G-2665/G-2666/G-2667). These fees were created to defray the cost of providing public improvements required by the city as a result of new development. They are broken down into two types: Residential and Commercial/Industrial fees.

A. Calculating DOF Fees

Water and Sewer DOF fees are the same. The figure you obtain for the Water DOF fee is used to calculate your Sewer DOF fee. You simply add the two fees together to obtain your total DOF fee, (i.e. Single-Family residential project: Water DOF $600 + Sewer DOF $600 = Total DOF $1200; Commercial project: 1" water meter within City = Water DOF $1,500 + Sewer DOF $1,500 = Total DOF $ 3000;

B. Residential Fees (Use chart below):

 

Type of Residence Inside City Fee Outside City Fee*
Single Family $600.00 $900.00
Mobile Home Space 420.00 630.00
Apartment or Dwelling Unit In a Multiple Family Development 360.00 540.00

C. Commercial and Industrial Development Occupational Fee will be based upon meter size.

Water Development Occupational Fees are based on three (3) factors: water meter size and water type (disk, compound, turbo) and if the side is inside or outside the boundaries. Sewer Development Occupation Fees are the same as water DOF fees.

 

Water Meter Meter Type Inside Outside
Size   City Fees City Fees
5/8" Disk $ 600 $ 900
3/4 Disk 600 900
1" Disk 1,500 2,250
1 1/2" Disk 2,760 4,140
2" Disk 4,500 6,750
2" Turbine 7,200 10,800
 
3" Disk 9,000 13,500
3" Compound 9,240 13,860
3" Turbine 16,200 24,300
4" Compound 15,000 22,500
4" Turbine 18,000 27,000
 
6" Compound 27,600 41,400
6" Turbine 37,500 56,250
 
8" Compound 48,000 72,000
8" Turbine 54,000 81,000

If you have additional questions contact the Water Services Infrastructure Record Services Division at 602-495-5601.