The formal bid tabulation is the final computations of each bidders bid after the City has reviewed, checked and revised, as required, the bid proposals. It contains the quantity and the per unit cost for each item and the total bid from the lowest five contractors.
| Bid Date | Project | Description |
|---|---|---|
| 8/19/08 2:00 PM | PW16810002 | SR 85 Landfill Cell 1 - Phase |
| 7/1/08 12:00 AM | ST87400110 | 2009 Major & Collector Street Overlay Program (Rev) |
| 7/1/08 12:00 AM | ST87400102 | 2007 Major & Collector Street Overlay Program |
| 5/6/08 12:00 AM | ST83110064 | Storm Drain 27th Ave: Roeser - Broadway |
| 5/6/08 12:00 AM | WS85500316 | Water Main Replacement: Central Ave - 7th Street |
| 5/6/08 12:00 AM | ST85100089 | Paving McDowell Road: 75th-83rd Avenues |
| 5/6/08 12:00 AM | WS90400022 | Lift Station No. 51 Repairs |
| 5/6/08 12:00 AM | ND30050070R | Neighborhood Learning Center - ReBid (CDBG) |
| 5/6/08 12:00 AM | ST87400116 | 2008 Portland Cement Concrete Repair 2 |
| 5/6/08 12:00 AM | ST87750094 - CDBG | Maryvale: Phase 1, 64th Drive: Osborn Rd-Indian School Road |
| 4/29/08 12:00 AM | ST85100275 | Cave Creek Road: Beardsley to Rose Lane |
| 4/22/08 12:00 AM | ST83120038 | Santa Maria Basin: 71st Avenue and Elwood |
| 4/8/08 12:00 AM | ST85100227t | Paving 44th Street & Indian School Road |
| 4/8/08 12:00 AM | WS85800005 | Remote Facilities Security Projects: 64th Street Reservoirs |
| 3/11/08 12:00 AM | ST87100148 | Palomino Sidewalks Phase II Area 1&2 |
| 3/11/08 12:00 AM | ST87100156 | Palomino Sidewalks Phase 1, Area II. |
| 3/4/08 12:00 AM | WS85050034 | Reservoir 1-ES3 Roof Rehabilitation & Misc. Repairs |
| 3/4/08 12:00 AM | ST89320046 | 2nd Avenue Street Scape: Fillmore to Roosevelt |
| 2/26/08 12:00 AM | ST85100229 | 51st Ave: Dobbins Rd to Laveen Conveyance Channel |
| 2/12/08 12:00 AM | ND30050070 | Neighborhood Learning Center |
| 1/29/08 12:00 AM | ST87400113 | 2008 Slurry Seal Program |
| 1/29/08 12:00 AM | FT70120004 - FTA | Paradise Valley Mall Transit Center Refurbishment |
| 1/8/08 12:00 AM | ST87400109 | 2008 Alley Way Dustproofing |
| 1/8/08 12:00 AM | PA75200383 | Sueno Park Sidewalk and Area Lights |
| 1/8/08 12:00 AM | PA75200383 | Sueno Park Sidewalk and Area Lights |
| 12/18/07 12:00 AM | ST87400111 | 2008 Major & Collector Street Overlay Program |
| 11/27/07 12:00 AM | WS85500285 | 48-inch Water Main Indian School Road Crossing @ Hwy 101 |
| 9/25/07 12:00 AM | ST89320052 FHW | Pedestrian School Safety Zone: Phase II |
| 9/18/07 12:00 AM | ST87110086 | Paving Meadowbrook: 7th - 12th Streets |
| 8/28/07 12:00 AM | WS85010040 | Water Main: 99th Avenue & Southern Avenue |
| 8/14/07 12:00 AM | ST85100228 | 51st Avenue: Laveen Conveyance Channel to Salt River |
| 8/7/07 12:00 AM | PA75200277-CDBG | Cielito Park Restroom Facility |
| 5/15/07 12:00 AM | ST85100269 | Jomax Road, I-17 Norterra Parkway |
| 5/8/07 12:00 AM | WS85050023 | Tank & Site Improvements: Well 276, Well 290, Well 294 |
| 5/1/07 12:00 AM | ST85100035 | 67th Avenue, Buckeye to Van Buren Paving & 67th Avenue Box Culvert at Harrison Street |
| 4/24/07 12:00 AM | ST83130234 | Denton Lane Alley Storm Drain |
| 4/24/07 12:00 AM | ST85100027ReBid | Paving & Waterline 52nd Street: McDowell Road to Thomas Road (ReBid |
| 4/24/07 12:00 AM | ST87400101 | 2007 Portland Cement Concrete Repair |
| 4/17/07 12:00 AM | ST85100096 | Paving and Storm Drain 75th Avenue: Buckeye/Van Buren |
| 4/17/07 12:00 AM | ST87750079 | Andalucia Phase I and II Sidewalk Improvements. |
| 4/3/07 12:00 AM | ST85100130t | Van Buren Street Paving Improvements: 67th Ave/59th Ave. |
| 3/27/07 12:00 AM | ST87600051- FHWA | Isaac Pedestrian Bridge At McDowell Road / 34th Avenue (FHWA). |
| 3/13/07 12:00 AM | ST83130249 | 9th Avenue Storm Drain: Peoria Avenue To ACDC |
| 1/30/07 12:00 AM | WS85010041 | Drilling and Installation of City of Phoenix Well No. 299 |
| 1/30/07 12:00 AM | ST85100048 | 35th Avenue Paving: Southern Ave to Broadway Road |
| 1/17/07 12:00 AM | ST87400103 | 2007 Slurry Seal Program |
| 12/19/06 12:00 AM | ST85100046 | Camelback Road Paving: 107th Ave-99th Ave; Camelback Road Storm Drain |
| 12/19/06 12:00 AM | PW16810003 | SR 85 Landfill Flare Station & Gas System PLans |
| 12/12/06 12:00 AM | ST87100127 - CDBG | 27th Avenue Paving: Deer Valley to Foothills; 27th Ave Storm Drain CDBG |
| 11/28/06 12:00 AM | WS85500282 | 7th Avenue Water Main Replacement - Jackson Street to Apache Street |
| 11/21/06 12:00 AM | ST83120017 | 24th Avenue & Camelback Basin and Storm Drain Improvement and Bid Alternates |
| 10/31/06 12:00 AM | ST87400106 | 2006/2007 Alley Dust Proofing |
| 10/31/06 12:00 AM | PW16810001 | SR85 Landfill Cell 1 Phase 2 Excavation & Lining |
| 9/19/06 12:00 AM | ST87600036 - FHW | 5st Ave./Cactus Rd. ACDC Trail Underpass |
| 8/29/06 12:00 AM | PT70130002 FTA | Transit Operating Facility Refurbishments - 2006 North and South Operating Facilities |
| 7/25/06 12:00 AM | WS90500189 | Sanitary Sewer Relief & Replacement Program |
| 7/25/06 12:00 AM | PT68120002 FTA - ReBid | Sunnyslope Transit Center Refurbishments ReBID. |
| 6/20/06 12:00 AM | ST87750057 | Sidewalk Improvements 42nd PL: Grovers Ave to (Union Hills Dr.) |
| 6/20/06 12:00 AM | WS85500267 | Water Main Replacement: ABB 31st Ave/Roosevelt/ (35th Ave/Van Buren) |
| 6/13/06 12:00 AM | WS85500268 | Water Main Replacement: ABB 27th Ave/Roosevelt/31st Ave/Van Buren Street. 31st Ave/Van Buren Street |
| 5/31/06 12:00 AM | ST85100027 | Paving 52nd Street: McDowell Road / Thomas Road |
| 5/31/06 12:00 AM | ST85100220 | Baseline Road and 35th Avenue Re-Alignment |
| 5/16/06 12:00 AM | ST87100147 | Paving 31st Avenue: Deer Valley Foothills |
| 5/9/06 12:00 AM | WS90500180 | Sewer & Manhole Corrosion Control Crown Spray Program 2005-06 |
| 5/2/06 12:00 AM | ST87400097 | 2006 Portland Cement Concrete Repair |
| 4/25/06 12:00 AM | WS85500270 | Water Main Replacement: 7th Ave/McDowell Rd/ 15th Ave/Roosevelt St. |
| 4/25/06 12:00 AM | ST87750067 | Mitchell Ave: 64th Dr - 63rd Ave to 64th Dr. Sidewalks |
| 4/25/06 12:00 AM | ST87100150 | 8th St: Cave Creek/Hatcher Rds 39th Dr.: Creedance/ Alameda |
| 4/18/06 12:00 AM | ST87400096 | 2006 Residential Street Overlay Program |
| 4/11/06 12:00 AM | ST85110008 | 35th Avenue Bridge Over Salt River |
| 3/28/06 12:00 AM | WS85050029 | 64th Street Basin #4 Roof Reservoir Rehab & Repairs |
| 3/28/06 12:00 AM | ST87100142 | CDBG Palomino Sidewalks Phase 1 Area 1 |
| 3/28/06 12:00 AM | PT63130004R | LNG Refurbishments at South Division - REBID |
| 3/28/06 12:00 AM | WS90500177 | Small Diameter Sanitary Sewer Rehab Project: 2005 -2006 |
| 3/14/06 12:00 AM | AH10110306 | Housing HVAC and Electrical Remodel Project |
| 3/14/06 12:00 AM | ST87400094 | 2006 Major & Collector Street Overlay Program |
| 3/14/06 12:00 AM | ST87400094 REBID | 2006 Major Collector Street Overlay Program REBID |
| 3/14/06 12:00 AM | PA75200133 | Rio Salado Equestrian Trailhead & Restroom Bldg. Project. |
| 3/7/06 12:00 AM | WS90500181 | Large Diameter Clay Sewer Rehab. Project Phase 3 |
| 2/16/06 12:00 AM | ST85110008R | 35th Avenue Bridge Over Salt River |
| 2/14/06 12:00 AM | PT70130004 | North & South Operating Facilities Vehicular Interior Cleaners Replacement |
| 1/24/06 12:00 AM | WS85500266-2 | Water Main Replacement 19th/Missouri/27th/Camp bell Avenues |
| 1/24/06 12:00 AM | ST87400095 | 2006 Slurry Seal Program |
| 12/13/05 12:00 AM | ST87750058 | Vineyard Sidewalks: 20th-22nd Street |
| 12/13/05 12:00 AM | ST83120028 | 26th Avenue/Verde Lane Detention Basin |
| 12/6/05 12:00 AM | ST85100044 | Paving Deer Valley Road: 7th Street to Cave Creek Road |
| 11/29/05 12:00 AM | WS85500266 | 19th Ave/Missouri/27th Ave/Campbell Water Main Replacement |
| 11/29/05 12:00 AM | ST87400093 | 2006 Major & Collector Street Microseal Program |
| 11/29/05 12:00 AM | WS85500273 | Hydrants: 19 to 39th Ave/Bethany to Glen-1 |
| 11/29/05 12:00 AM | ST87400093 REBID | 2006 Major & Collector Street Microseal Program |
| 11/29/05 12:00 AM | PT68120002 | Sunnyslope Transit Center Refurbishments |
| 11/1/05 12:00 AM | WS85500272 | Fire Hydrant Installation ABB: 71st & 95th Avenues/ Thomas & Campbell Avenue |
| 10/11/05 12:00 AM | ST89310092 | Campbell Ave & 99th Avenue Paving |
| 9/27/05 12:00 AM | WS85100020 | Replace 3 A-B2 Booster Station Upgrade @ 16th Ave /Palmer Dr. |
| 9/27/05 12:00 AM | ST87400091 | 2005/2006 Alley Dust Proofing Proggram |
| 7/19/05 12:00 AM | ST89310073 FHWA | 43rd Avenue & RID Canal Bridge |
| 5/17/05 12:00 AM | ST85100174 | Paving 35th Avenue: Deer Valley Road to Pinnacle Peak Road REBID |
| 4/12/05 12:00 AM | WS85500259 | Annual Water and Sewer Emergency Repair Contract |
| 9/21/04 12:00 AM | ST87750051 | Missouri Avenue Sidewalk: 35th Avenue to 27th Avenue |
| 4/22/04 12:00 AM | ST83120038 | Santa Maria Basin: 71st Avenue and Elwood Street. |
| 2/24/04 12:00 AM | WS90500123 | Water & Sewerline Improvements Estrella Village: 67th Avenue to 91st Avenue |
| 2/18/04 12:00 AM | ST83130174-1010 | 3131 E Old Southern Avenue Storm Drain |
| 2/18/04 12:00 AM | ST87400070 | 2004 Portland Cement Concrete Repair |
| 2/10/04 12:00 AM | ST87600041 | Arizona Canal & 3rd Avenue Pedestrian Bridge |
| 1/27/04 12:00 AM | PW16610002 | Skunk Creek Landfill Cells 3 & 4 Closure Phase II |
| 1/21/04 12:00 AM | PW16630002 | Skunk Creek Liner & Cap Cell 5 Closure Phase II |
| 1/21/04 12:00 AM | AH10110209 CDBG REBID | Aquatic Playground @ Edison Park |
| 1/13/04 12:00 AM | AV09000031-30 FAA | Residential Sound Assistance Program Phase 3.30 |
| 1/13/04 12:00 AM | ST87400068-1010 | 2004 Slurry Seal Program |
| 12/16/03 12:00 AM | ST87600020 FHWA | Maryland Avenue Pedestrian Overpass |
| 12/16/03 12:00 AM | AV41000042 FAA | Goodyear Airport Taxiway A & Apron Reconstruction |
| 12/16/03 12:00 AM | WS85500216 | Watermain & Service Replacement ABB: Van Buren St/I-10/39th Ave/35th Ave REBID |
| 12/9/03 12:00 AM | ST87100117-1010 | Paving ABB: Washington St/Van Buren St/28th St/ 30th St |
| 12/9/03 12:00 AM | ST87400066-1010 | 2004 Major/Collector Street Overlay Program |
| 12/9/03 12:00 AM | PW21010002-1010 | Glenrosa Service Center Air Sparge Well Installation & Development Phase I |
| 12/9/03 12:00 AM | PW21010002-1010 | Glenrosa Service Center Air Sparge Well Installation & Development Phase II |
| 11/18/03 12:00 AM | ST87110077 | Paving Campbell Avenue: 26th Avenue to I-17 |
| 11/12/03 12:00 AM | ST87400071 | 2004 Sidewalk Ramp Retrofit |
| 11/12/03 12:00 AM | ST87400065 | 2004 Major/Collector Street Microseal Program |
| 11/12/03 12:00 AM | WS85500147 | Water Transmission Main 67th Ave: Baseline Rd to Broadway Rd |
| 11/4/03 12:00 AM | ST87110071 & ST87110076 | 30th St, Sunnyside Rd to Cactus Rd & 24th St, Larkspur Dr to Sweetwater Ave |
| 10/28/03 12:00 AM | ST85100054 | Paving Baseline Road: 16th Street to 40th Street |
| 10/21/03 12:00 AM | WS85500217 | Pecos Park Waterline Extension: Pecos Park to Cottonwood Lane |