Tabulations and Awards by Solicitation Number

Goods/General Services
Tabulations and Awards by Solicitation Number

The Purchasing Division posts preliminary tabulations within five (5) calendar days after the advertised bid opening date. The information on the preliminary tabulation will be posted as it was read during the bid opening. The city makes no guarantee as to the accuracy of any information on the preliminary tabulation. The bid tabulations do not reflect payment terms and/or SBE price preference.  Once the city has completed its evaluation, an award recommendation will replace the preliminary tabulation.

To view/print a preliminary tabulation or an award, click on the solicitation (IFB/RFP) number listed below.

Tabulations can also be obtained:

 


Solicitation Number Description Date Opened Buyer
IFB 09-019 Preliminary - Envirox Cleaner Products - Requirements Contract 9/19/08 2:00 PM Mike Meloy
IFB 09-025 Preliminary - Badging Supplies - Requirements Contract 9/26/08 2:00 PM Anne Shadle
IFB 09-031 Preliminary - Fleet Vehicle Mobile Air Conditioning Services & Repair 10/3/08 2:00 PM Terry Hudson
IFB 09-036 Preliminary - Boiler System Chemical, Treatment and Testing Services - R/C 10/17/08 2:00 PM Chuck Garvey
IFB 09-040 Preliminary - Operable Wall Maintenance - Requirements Contract 10/3/08 2:00 PM Roseann Yrigoyen
IFB 09-041 Preliminary - Packer Body & Articulating Loader Lubrication Service 10/3/08 2:00 PM Chris Gray
IFB 09-042 Preliminary - Service and Repair of Appliances - Requirements Contract 10/10/08 2:00 PM Roseann Yrigoyen
IFB 09-050 Preliminary - Motor Vehicles, 2009 Models - Requirements Contract 9/26/08 2:00 PM Chris Gray
IFB 09-053 Preliminary - Towing & Minor Auto Assistance - Requirements Contract 10/10/08 2:00 PM Linda Duarte
IFB 09-056 Preliminary - Climate Controlled Storage - Requirements Contract 10/17/08 2:00 PM Chuck Garvey
IFB 09-059 Preliminary - Small Lawn & Graffiti Equipment Repair - Requirements Contract 10/10/08 2:00 PM Dora Chavez
IFB 09-061 Preliminary - Calcium Hypochlorite - Requirements Contract 10/17/08 2:00 PM Michelle HOnea
IFB 09-069 Preliminary - Ames Valves - Requirements Contract 10/17/08 2:00 PM Edith Barrera
RFP 08-027 Preliminary - Hazardous Material Removal and Disposal - Requirements Contract 8/22/08 2:00 PM Rose Camacho
RFP 08-028 Preliminary - Traffic Count/Turning Movement/Pedestrian Studies - R/C 9/19/08 2:00 PM Ron Helton