New Construction Projects in District 5
Capital Improvement Construction Projects
There are no projects at this time.
Sewer Replacement Project
The city of Phoenix Water Services Department has begun construction to install new water main services and fire hydrants in the area bounded by 27th Ave. and 39th Ave. between Bethany Home Rd. and Maryland Ave. The anticipated completion of construction is in August 2009. There will be some traffic lane restrictions during the improvement activity; however, the contractor will maintain access for residents, businesses and emergency vehicles at all times. Residents will be notified prior to any driveway access restrictions. For more information, please contact the construction hotline, at 602-956-2670.
Sidewalk Installation Program Project
The city of Phoenix Street Transportation Department has begun construction to install sidewalks on 64th Dr. between Osborn and Indian School roads, and the Weldon Ave., Fairmount Ave. and Amelia Ave. cul-de-sacs east of 64th Dr. Construction will begin the week of September 8 and the project is anticipated to be completed by March 2009. There will be some traffic lane restrictions during the improvement activity, however the contractor will maintain access for residents, businesses and emergency vehicles at all times. For more information, please contact the construction hotline, at (602) 956-2670.
Street Modernization Program (Paving, Curb, Gutter, Sidewalks, and Streetlight upgrades)
There are no projects at this time.
Storm Drain and Roadway Improvement Project:
There are no projects at this time.
Completed Projects in District 5
Bethany Home Grand Canal Flood Control Project: The project is approximately five miles in length and goes through agricultural, residential, and equestrian properties within the cities of Glendale and Phoenix, and Maricopa County is now completed in District 5. The Project Team has divided the project into segments based on neighborhood characteristics and major street crossings. For segment location map and project information, visit Web site fcd.maricopa.gov or call 602-506-8004
Maryland Avenue Pedestrian Overpass at Interstate 17 and Maryland Avenue.
The Street Transportation Department Sidewalk Installation program has completed the installation at the following location:
along 99th Avenue and107th Avenue between Camelback Rd. and Indian School Rd.
Keim Dr., between 19th Ave.and 21st Ave.
along Mitchell Avenue between 63rd Avenue and 64th Drive and along 63rd Avenue between Osborn Rd. to the Grand Canal.
in the neighborhood bounded by 50th Dr., 49th Ave., Indian School Rd., and Pierson St.
on 47th Ave., between Indian School Rd. to Campbell Ave.
The Street Transportation Department Street Modernization program has completed the installation at the following location:
Orangewood Ave. and Northern Ave. between 31st Ave. to 35th Ave.
Campbell Ave. and Camelback Rd. between 87th Ave. and 91st Ave.
Camelback Rd. between 43rd Ave. and 35th Ave. was resurfaced with rubberized asphalt.
75th Ave. between Thomas Rd. and Indian School Rd. was resurfaced with rubberized asphalt.
Clarendon Ave. between 55th Ave. and Indian School Rd. was resurfaced with rubberized asphalt.
Glendale Ave. between Seventh Ave. and 19th Ave. was overlayed with rubberized asphalt.
Indian School Rd. between 59th Ave. and 67th Ave. was resurfaced with rubberized asphalt.
Maryvale Parkway between Indian School Rd. and Camelback Rd. was resurfaced with rubberized asphalt.
Maryvale Parkway between Clarendon Ave. and Indian School Rd. was resurfaced with rubberized asphalt.
73rd Ave. between Flower St. and Weldon Ave. was recently widened and curb, gutter, and sidewalk was installed.
The Street Transportation Department Storm Drain and Roadway Improvement Project:
The city of Phoenix Street Transportation Department has completed the installation of the new ADA pedestrian ramps and radius curb returns on the southeast and northeast corners of 107th Ave. and Camelback Rd.; repaving the north side of Camelback Rd. approximately 500-feet north of Camelback Rd. and the east side of 107th Ave. approximately 500-feet north of Camelback Rd.
The Water Department Sewer Replacement project has completed the installation at the following locations:
along 71st Drive between Indian School Rd. and the Grand Canal.
along 71st Drive between Campbell Ave. and Indian School Rd.
along 19th Ave. between Hatcher Rd. and Ironwood Dr. and along Carol Ave. just east of 19th Ave.