Colter Street from I-17 east frontage road to 23rd Avenue
Design 5-foot attached sidewalks on the north side of Colter Street between the I-17 east frontage road and extending 735 feet to the east; on the south side of Colter Street between 23rd Avenue and extending 645 feet to the west. Where 5-foot sidewalks are not possible due to limited ROW or obstructions, 4-foot sidewalks are acceptable. Design 2 ADA curb ramps (NEC of Colter & I-17 frontage road, NWC of Colter & 23rd Avenue) 1 modified driveway-ADA ramp (SWC of Colter & 23rd Ave), 1 commercial driveway entrance on the north side of Colter Street, and 10 residential driveway entrances on the south side of Colter Street between 23rd Avenue and 645' west of 23rd Avenue, install one streetlight on the south side of Colter Street, relocate 3 fire hydrants on the north side.
Pavement treatment will also be completed to restore a smooth driving surface when completed.
Map of Project Area
Timeline
Design is underway with construction anticipated to begin in fall 2024.
Project Number: ST87750155
Project Contact: Jeff Herzhaft, 602-918-0211
jeff.herzhaft@phoenix.gov