A full service includes a water tap and meter installation from a water main located in the right-of-way or easement. City crews will install the tap from the main to the property line. Location of the tap shall marked by the contractor and meet the guidelines stated the city Code . The box, meter and tap remains the property of the city of Phoenix Water Services Department.
METER SIZE |
WITH PAVING FEE |
WITHOUT PAVING |
5/8" |
$3,041 |
$1,753 |
3/4" |
3,066 |
1,779 |
1" |
3,550 |
2,263 |
1.5" |
4,005 |
2,806 |
2" |
4,152 |
2,953 |
*3" |
8,555 |
7,526 |
*4" |
9,551 |
8,522 |
*6" |
12,269 |
11,240 |
*6" FM |
12,643 |
11,614 |
*8" FM |
13,138 |
12,720 |
Fee Effective Date 01/02/2008.
*Cost Recovery Required
* 3", 4", 6" AND 8" Sizes and relocation to be constructed at cost, with trust deposit in the amount shown. The Developer/contractor must sign cost recovery form. Concrete water vault required for all 3", 4", 6" and 8" meters to be installed by developer/contractor after Water Services Department coordinates installation of services.
If you have additional questions contact the Water Services Infrastructure Record Services Division at 602-495-5601.