Skip to main content

Website Maintenance

Our website will undergo routine system maintenance on May 10, 2025. While no major disruptions are expected, some services may be temporarily unavailable between 6:00 AM and 3:00PM.

City of Phoenix official website

    ​​​​​​​​​​​​Vineyard Road Pedestrian Safety Study - 7th St to 16th St​​​​​​​​​​

    The goal of the Vineyard Road Pedestrian Safety Study is to evaluate alternatives and recommend enhanced mobility design solutions for Vineyard Road from 7th Street to 16th Street.

    Recommendations will focus on improving the safety, accessibility, and multimodal connectivity of the area’s residents and children walking, biking, or rolling to or from John F. Kennedy Academy of Inquiry and C.O. Greenfield Academy of Design and Innovation.

    The challenging conditions on Vineyard Road, including half-street conditions and lack of sidewalks, has been a concern of the neighborhood for years. Community advocates have encouraged the city study options to improve safety in the area.​

    Project Details

    Scope of Work

    The scope of work includes:

    • Determining appropriate locations and configurations of new sidewalk(s) or modifying existing sidewalks to improve pedestrian and bicycle movements and safety.
    • Determine best approaches to build this segment out to a full roadway width from its current half-street configuration.
    • Determine appropriate locations and configuration of bicycle lanes and related infrastrucure.
    • Evaluate the roadway to identify opportunities for the addition of traffic calming devices.
    • Analyze roadway to determine where street lighting could be added or upgraded to improve safety.
    • Determine if tree shade, landscape improvements, and/or green stormwater infrastructure (GSI) can be installed.
    • Evaluate roadway and intersections to determine if a High‐Intensity Activated Crosswalk (HAWK) or other pedestrian signal should be installed.
    • Evaluate roadway and intersections to determine if existing traffic signals should be upgraded.
    • Identify any historical land use or generational land ownership that could be memorialized.​​​

    Study Phase

    The Study Phase is the earliest phase of a potential project. This study will be used to assess the feasibility of a variety of possible safety improvements for this segment. Once the study is completed, the Street Transportation Department will make decisions if the project will advance to the design phase.

    Schedule

    Pre-Design Study - Summer 2024 to Summer 2025

    Co​mmunity Engagement

    This project includes meaningful opportunities for engagement with residents, schools, and businesses in the area. The first round of outreach, completed in fall 2024, focused on listening to stakeholders’ safety concerns along the Vineyard Road corridor and exploring potential solutions. A second round of focused outreach is planned for spring 2025, offering stakeholders the chance to review and provide input on proposed alternatives.

    Vineyard Road Pedestrian Safety Study Area

    Vineyard Road Pedestrian Safety Study Area, ranging from 7th Street to 16th Street.

    Contact the Project Team

    Brian Fellows​, Principal Planner

    ​Public Information Contact
    Anne Thompson​, Your Project Marketing and Outreach

    Project Hotline: 602-235-2600