Dobbins Road: State Route 202 to 27th Avenue

​Share this page​

​​​​​​​​​​​​

About the Project

The Phoenix Street Transportation Department is in the planning and pre-design phase of a project that would improve the transportation network along Dobbins Road, from State Route 202 (Loop 202) to 27th Avenue. 

The goals of the project will lead to reduced traffic congestion, improved safety for pedestrians and people riding bicycles​, and increased access to public transit. Improvements also would address drainage issues and mitigate flooding conditions.

Project highlights:

  • Developing a consistent corridor that increases the traffic capacity along Dobbins Road (four through travel lanes)
  • Connect the Laveen community with multi-use path and transit improvements
  • Maintain rural scenic corridor with mountain views
  • Lighting improvements
  • Drainage improvements
  • Landscaping improvements
  • Intersection and traffic signal improvements
  • Utility relocations

Project Resources

The Dobbins Road Design Concept Report (DCR) Update was published in May 2017. It replaced the Dobbins Road DCR that was published in 2003. ​

Read the Dobbins Road Design Concept Report Update 
The Maricopa Association of Governments (MAG) Laveen South Mountain Transportation Study was published in December 2020. 

Read the Laveen South Mountain Tran​sportation Study ​ ​

Project Timeline

Request for quote (RFQ) process: Anticipated May 2024
Begin design phase: August 2024
Begin construction phase: July 2027

Contact the Project Team

Chuck Christiansen, PE
chuck.christiansen@phoenix.gov
602-262-4054​


Map of Project Area

Project Area Map - Dobbins Road from Loop 202 to 27th Avenue