Description
The project will install a new storm drain and catch basins along Palm Lane between 28th Place and 32nd Street. The design and construction of the project is being done in cooperation with the Flood Control District of Maricopa County.
Project Highlights
Install approximately 2,800 feet of new storm drain
Install new catch basins
Replace existing curb, gutter and sidewalks, as well as driveways in some locations
Relocate sections of water, sewer, and gas lines to accommodate the new drainage system
Goal of the Project
Project Status
Construction Start - September 2021
Construction is substantially complete
Project Contact
Hotline Number: (480) 281-1506
Project Manager: John Dee
Updated December 2022