Project Details
Project Highlights
- Widen roadway to add a two-way left turn lane
- New pavement
- Sidewalk repairs
- Street light upgrades
- Traffic signal improvements
- New storm drain
Goals of the Project
- Improve traffic flow by providing a dual left turn lane for commercial vehicles to access properties in this industrial area
- Improve the roadway surface
- Improve pedestrian safety and connectivity
- Improve drainage
- Improve street lighting and signals
Schedule
Design and Right of Way Acquisition is anticipated to be complete November 2023
Construction anticipated to begin summer 2026